Increase the efficiency of the building envelope by installing bio-based phase change insulation on the exterior walls and under the roof sheathing. Provide and install phase change material (PCM) onto new framing, provide and install rain screen and cavity wall continues insulation, provide and install typical exterior water proofing methods, provide and install exterior finish and insulation system.
Repair damaged concrete drainage system at BLDG 699 and 838. Remove and install sand filters, remove and install clarifiers, repair/replace damaged concrete.
Removed disaster generated debris within Santa Barbara County, Montecito and Capinteria, including several filled debris basins and channels. Emergency debris clearance, separation, removal hauling, disposal. Structural demolition, transporting of all debris removed, disposal of all debris, 25,000 cubic yards of debris removal.
Provide training environment for G3, Urban and FOB Operations. Provided Grading, compaction & and drainage survey. Install 100 8’x8’x40’ converted shipping containers, install plexiglass windows, doors, weather proof containers.